The link between Cracow Krzemionki and Cracow Zablocie

Kolejowe Zakłady Łączności implemented a teletransmission system together with a dynamic passenger information system for the Cracow Krzemionki – Cracow Zablocie junction.

The scope of works included, among others, installation over a dozen passenger information displays together with the system, organization of a dispatch station in Płaszów, installation of a public address system and conducting trainings.

Przewijanie do góry